Cracks that keep widening
A hairline crack along a control joint is normal on almost any concrete slab, but a crack that opens wider every season usually means the ground underneath is moving.
Ask about this
HomeDriveways and walls
Concrete driveways and walks, block retaining walls and the grading under them. A free quote at your place, the same day or the next.
A new walk
A slab floorWest Georgia clay moves when it gets wet, so a driveway or a wall that lasts starts with what is under it: the ground graded and packed, a base that drains, and the concrete or block set on top of that. Skip that part and the cracks and the lean show up in a year or two, no matter how good the top looks on day one.
Two of our own jobs: a concrete walk to a backyard building, and the slab floor of a metal building.
Leave your name and number, or call 770-880-6549. Justin and Jacob answer the phone, days and after 5.
Justin or Jacob looks at the ground, the slope and where the water goes, and talks it through with you.
You get one number for the whole job, before any of the work starts. Nothing on your property starts until you have seen that number and said yes.
Same day or next day, at your place. Takes a minute.
Thank you. We will call you back at the number you gave us. For the fastest reply call 770-880-6549.
Prefer to talk? Call 770-880-6549. Our work carries a 5-year workmanship warranty.
Most concrete and wall calls we get from Carrollton, Villa Rica and Newnan start with one of these four signs.
A hairline crack along a control joint is normal on almost any concrete slab, but a crack that opens wider every season usually means the ground underneath is moving.
Ask about thisA section that has sunk below its neighbor usually sits on a base that washed out or was never packed, and the low edge it leaves behind becomes a trip for everyone.
Ask about thisRain running off the drive carries the red clay away from the edges, or runs straight at the garage door. Correcting the grade usually matters more than replacing the concrete.
Ask about thisA retaining wall that tips forward usually has water pushing behind it or a weak base under it. It rarely straightens itself, and it usually gets worse every season.
Ask about thisThe old driveway or the topsoil usually comes out first, down to firm ground. Then the clay is cut to grade, so water runs off the edges instead of across the slab.
A crushed stone base goes down and gets compacted firm, layer by layer. Then the forms are set to the exact height and slope the finished drive needs.
The concrete is delivered, poured, leveled and finished, usually all in one day. The control joints are cut so it cracks along the lines, not across the middle.
Usually you can walk on it in a day or two and drive on it after about a week. We tell you the timing for your particular slab and the weather that week.
The part you see is the last layer, and these are the parts that usually go in under it.
The ground is cut to grade and a packed stone base goes down, so water drains away and the slab or the wall sits on something firm.
Poured, finished and cut with joints, so it cracks where it is meant to, along the lines, not across the middle.
Interlocking block is set on a level base and stepped back into the hill. Gravel and a drain usually go behind it, so the water collecting there does not push the wall over.
Water is usually what breaks concrete and pushes retaining walls over in the end. So every quote looks at where the rain goes and how to send it somewhere else.

Hulsey Construction did an amazing job on my project! Their team was professional, efficient, and their craftsmanship really shows. The process was smooth, communication was great, and the results exceeded my expectations. If you need quality work done right, I highly recommend them!
Concrete and walls across West GeorgiaAbout 50 miles around Carrollton, our home base
One price for the whole job before any work starts, and nothing starts until you say yes.
A longer or wider driveway usually means more crushed stone and more concrete. A driveway that carries a truck or a trailer usually needs to be thicker than one for two family cars.
Clay that has to be cut, hauled or built up adds work before any concrete arrives. A sloped lot in Bowdon or Temple usually needs more grading than a flat one.
Breaking up and hauling away an old drive adds work before anything new goes in. A new drive on bare ground usually starts sooner and costs less to prepare.
The concrete truck has to reach the forms, and a tight lot can mean pumping or extra handling. A taller retaining wall needs a deeper base and more drainage behind it.

This is a new concrete driveway we poured in Douglasville, running up to the garage of a brick home. The photo was taken while it was still taped off, during the days new concrete has to be kept clear.
Plain answers to what homeowners usually ask about concrete driveways and retaining walls, and anything else you can ask Justin or Jacob when they come out.
Concrete shrinks as it cures and the ground under it moves as the clay wets and dries. Joints and a well-packed base keep the cracks on the lines, where you usually do not notice them.
Usually you can walk on it in a day or two and drive on it after about a week. We tell you for your slab, because the weather and the thickness both change it.
A packed base, the right thickness for what drives on it and joints cut in the right places. Sending water away from the edges matters too, while the finish on top usually matters least.
Sometimes. A leaning wall usually has water behind it or a weak base under it, so we look at both and tell you whether it can be reset or needs rebuilding.
No. The quote is free, and we give it in person, usually the same day you call or the next day. Justin or Jacob looks at the ground, the slope and the water with you.
Yes. Our driveways and walls carry our 5-year workmanship warranty, which covers the way the work was done.
The same family, the same crews, one free quote.
New homes for the right customer. Call and talk it through with Justin or Jacob before anything is drawn.
See details on New home constructionMore room on the house you have, with our own framing, plumbing and electrical crews under one quote.
See details on Room additionsWalls and trim inside, siding and porches outside, and the house, deck and drive washed clean.
See details on Painting and pressure washingA new deck built to fit your yard. The 12x12 is the one we build most, and it usually takes 1 to 2 days.
See details on Custom decks